Webpage 84400

Материал из MediaWikiWelcom
Перейти к навигации Перейти к поиску

Amplus computerised monitoring of the boring and also concreting series results in the reliability and also uniformity of production making CFA stacks amongst the most monitored and predictable structure aspects being used. Bored stacks have a greater sensitivity to corrosion when their diameter is little. The bored pile was designed by the French engineer Eugene Freyssinet in 1877. In France, Freyssinet's firm became the leader of the boring sector in Europe, mini piling contractors north west but he did not patent his creation.